Frampton Bridge

Dimensions

18.5m x 4.8m

Single Span

Client

The Australian Rail Track Corporation (ARTC)

InQuik Products

IQ1000

About

The Australian Rail Track Corporation (ARTC) is a government-owned statutory organisation responsible for managing and maintaining one of Australia's largest rail networks, spanning over 8,500 kilometres.

In a strategic move to enhance safety and connectivity in the region, ARTC engaged Brunton Engineering and Construction to replace an outdated timber overbridge located between the regional New South Wales towns of Junee and Cootamundra.

Minimal Disruption: Line possession was not required, work was carried out over the live rail line to minimise disruptions.

Robust and resilient structure.

Swift Installation: The bridge installation was completed swiftly in only two weeks, by a three-person skilled crew, highlighting the efficiency and proficiency of the project execution.

Project Gallery

Location

Cootamundra

New South Wales

2590

Australia

Request a Quote

Request a free consultation to define a solution that aligns with your project requirements and budget.