Koloona Drive Bridge

Dimensions

16.1m x 7.2m

Single Span

Client

Shoalhaven City Council

InQuik Products

IQ1000

About

The bridge replacement occurred in two halves, ensuring uninterrupted access and mastering complexity with InQuik innovation!

This project demonstrates the power of InQuik technology and versatility in overcoming construction challenges, as well as collaborative efforts in the #FixingCountyBridges Initiative, with the active participation of Shoalhaven City Council and Transport for NSW.

The innovative approach involved constructing the bridge into two halves. Initially, a 16.1 x 4.8m section was opened, allowing traffic to flow seamlessly. Subsequently, a 16.1 x 2.4m addition transformed the structure into a two-lane bridge post-demolition.

Project Gallery

Location

Koloona Dr

NSW

2750

Australia

Request a Quote

Request a free consultation to define a solution that aligns with your project requirements and budget.