Skip to main content

An Innovative, Cast-In-Place Solution

  • Quality of cast-in-place structures with efficiency of pre-cast methods
  • Saves significant time and reduces labor/construction costs
  • Installation completed in less than a week after the foundation
  • Durability for over 75+ years with minimal maintenance
  • Self-supporting design eliminates need for joints, bearings, tie-downs, or bracing and dewatering
  • Simplifies construction process, optimizing overall efficiency

How it Works

Pre-Engineered, Pre-Certified and Pre-Fabricated Bridge Components

Fast installation

Lightweight panels can be placed into position using small cranes or local excavators. Typically takes 3 – 5 days to install the bridge.

Easy Transport

Panels are designed to be efficiently stacked and transported in the form of a shipping container.

Certified & Durable

75+ year design life, with engineering certified by ARUP to the AASHTO LRFD Bridge Design Specifications – 9th Edition.

Low Maintenance

Minimal maintenance with no deck joints, longitudinal joints, tie-downs or bearings.

Safe and fish-friendly

Construction from above, improving safety and reducing environmental impact. No propping, bracing, or any work within the waterway required.

InQuik Road Bridge Specifications and Information

The patented InQuik Construction System is an innovative semi-modular method to build reinforced concrete bridges and includes deck panels in spans from 20 to 60 feet, abutments, wing walls, headstocks and blade piers.

Download InQuik Bridges
Product Catalog

The InQuik® bridge is a semi-modular system, where the integrated steel formwork and reinforcing components are prefabricated off-site, then completed when concrete is poured on-site to form a single homogeneous mass.

Download PDF

2.89 MB file size