Lightweight panels can be placed into position using small cranes or local excavators. Typically takes 3 – 5 days to install the bridge.

An Innovative, Cast-In-Place Solution
- Quality of cast-in-place structures with efficiency of pre-cast methods
- Saves significant time and reduces labor/construction costs
- Installation completed in less than a week after the foundation
- Durability for over 75+ years with minimal maintenance
- Self-supporting design eliminates need for joints, bearings, tie-downs, or bracing and dewatering
- Simplifies construction process, optimizing overall efficiency
How it Works
1
Place abutments & concrete
2
Install barriers & place decks
3
Pour the remaining deck concrete
4
The bridge is now complete!
Pre-Engineered, Pre-Certified and Pre-Fabricated Bridge Components
Fast installation
Easy Transport
Panels are designed to be efficiently stacked and transported in the form of a shipping container.
Certified & Durable
75+ year design life, with engineering certified by ARUP to the AASHTO LRFD Bridge Design Specifications – 9th Edition.
Low Maintenance
Minimal maintenance with no deck joints, longitudinal joints, tie-downs or bearings.
Safe and fish-friendly
Construction from above, improving safety and reducing environmental impact. No propping, bracing, or any work within the waterway required.
InQuik Road Bridge Specifications and Information
Bridge Range
Product | Description | Span (ft) | Standard Width (ft) | Load Ratings | Deck Depth | Skews | |
IQ14 | Culvert Replacement | 21' | no spacer 16' 24' 31' | with spacer 18' 27' 1/2" 37'-5" | HL-93 | 14" | 0, 6, 12 or 18 degrees |
IQ27 | Standard 27' 1/2" deep deck | 30' 40' | no spacer 16' 24' 32' | with spacer 18' 27' 3/4" 37'-5" | HL-93 | 27" | 0, 6, 12 or 18 degrees |
IQ40 | Standard 40 1/2" deep deck | 53' 61' | no spacer 16' 24' 32' | with spacer 18' 27' 3/4" 37'-5" | HL-93 | 40" | 0, 6, 12 or 18 degrees |
Explanation | All standard InQuik deck panels are 8' wide and are placed side-by-side with about a 2" overlap between the deck panels. | Our span lengths range from 21' to 61' | Our standard widths range from 16' to 32' | Extension spacers may be placed between the panels to increase the width by 22" per joint. with spacer | InQuik offers bridge designs for HL-93 load ratings and special permit vehicles as required. | See our "deck dimensions" table for more information. | Can service +/- 5 degrees |
Deck Dimensions
All standard lnQuik deck panels are 8ft wide, and are placed side-by-side with 2″ overlap between the deck panels (eg: a bridge that is 2 panels wide would therefore be 16ft in width).
The top deck slab is 8″ deep, and the center deck formwork is stiffened by 1 1/2″ deep corrugations.
The standard IQ27 superstructure panels have a total depth of 27″ from the underside of the girder to the top deck, while the IQ40 panels have a total depth of 40″.
The IQ14 bridge (suitable for culvert replacements) has a total depth of 14″ which is great for water afflux.
InQuik supplies the loose rebar to splice the panels together onsite, both transversally and longitudinally.
Note that the deck effective spans are defined from the centerline of the standard 36″ wide abutments (thus, the clear span is 36″ less than the effective span).

The InQuik superstructure can be simply supported on bearings, or fully internal since it’s cast-in-place.
During construction of an integral bridge, concrete is placed in the abutment first, up to the seat, leaving part of the reinforcing cage exposed above the seat.
The superstructure panels are installed onto the seat, so the rebar in both the abutment and superstructure are tied together onsite, connecting the reinforcing.
The concrete is placed in the superstructure and deck, creating a monolithic concrete slab with the abutment.
This results in a very strong, stable and durable structure, providing greater resistance to flooding and earthquakes. It also eliminates the need for bearings and tie-downs, and the associated maintenance requirements for the life of the structure.
InQuik Features | Benefits |
Pre-engineered, pre-certified, pre-fabricated | Simple and fast on-site installation |
No bearings, tie-downs, or joints | No long-term structural maintenance over 75+ year design life |
Pre-fabricated components with concrete poured on-site | Reduced OSHA risk, reduced trades, reduced installation time on-site |
Lightweight components | Reduced OSHA risk, small local cranage, ease of transportation |
No joints in structure | No joints to allow salt and water ingress |
Self-supporting modular structure | No temporary bracing or supports required |
Faster, simpler, safer with no maintenance | Reduced project costs & reduced 'whole-of-life' costs |
In addition to the standard InQuik bridge components, we can also provide custom design features at additional cost.
Standard Component | Customization |
Abutment Heights | Abutments higher than 8' may be possible, but require project specific engineering verification. |
Wing Walls | Custom wing wall arrangements may be possible, but require specific engineering. |
Multi-span Headstock | If crossfall is required it can be designed into the headstock top surface. It will sit flat on the piles. |
Barrier Design | We can incorporate non-standard barrier designs, according to site requirements. The InQuik system is suitable for up to medium performance barriers, but unusual barrier designs may require engineering verification. |
Deck Slope | For wider bridges and larger crossfalls, one-way crowned crossfalls may be incorporated into abutment shelf. |
Services | Service brackets can be incorporated underneath the bridge for simply-supported designs only. For integral bridges, services can be mounted on a bracket at the side of the bridge. |
The deck formwork is a permanent fixture and remains in place, providing a protective barrier for the concrete against corrosive influences from the environment that can cause concrete degradation.
There are three options for the deck formwork cladding: Weathering Steel, ZAM, and Stainless Steel, which each have different corrosion behavior. The most suitable cladding component would be selected based on its corrosion performance in each bridges’ specific environment. Other materials would require a special order.
ZAM |
ZAM is a product which is steel coated with an alloy of zinc, aluminium and magnesium. This coating has been shown to have far superior corrosion resistance properties to zinc galvanised steel, particularly in salty environments. Due to the high corrosion resistance, less material is needed to coat the steel, and it achieves a superior result. In a marine environment, the coating loses ~0.3 µm/year in thickness. ZAM is the only metallic coating product certified for use in a C5 environment. |
Weathering Steel |
Weathering steel is a high strength formwork cladding material that develops a stable oxide layer on the surface of the steel, known as the ‘patina’. When used in the appropriate environment, the patina enhances the corrosion resistance of the steel compared to conventional uncoated steels, effectively ‘weathering’ the steel in a natural way. Once fully formed and weathered the appearance is usually dark brown to a purple colour that nicely blends with the environment. Weathering steel has been used since the 1930s in railway coal wagons, bridges, facades, and many architectural features such as sculptures and landscaping. When designed and detailed correctly, considering the environmental factors that govern its use, it has exhibited enhanced corrosion resistance. This means that weathering steel formwork cladding may be used without the need for protective coating systems, significantly reducing both initial fabrication and ongoing lifetime maintenance costs. |
Stainless Steel |
For bridge projects where aesthetics are important in the long-term, and/or the bridge is to be constructed in a highly corrosive environment (e.g. tropical, industrial, etc.), stainless steel cladding can be used, which has extreme resistance to corrosion. For 316 grade stainless steel, the estimated time for pitting to penetrate 1mm is 260 years in a marine environment (the steel cladding is 3mm thick), implying the formwork is likely to outlast the bridge structure. |
The InQuik deck panels have been designed to satisfy the load rating criteria for HL-93 (AASHTO LFRD 9th Edition) bridge design specifications.
The simply-supported deck design is 0.3-0.5t heavier than the integral design.
Span (ft) | Load Rating | Integral Mass (t) | Approx. concrete volume (yd³) |
21 | HL-93 | 2.3 | 8.0 |
30 | HL-93 | 3.3 | 11.6 |
40 | HL-93 | 4.2 | 15.3 |
45 | HL-93 | 5.8 | 17.3 |
53 | HL-93 | 9.4 | 30.5 |
61 | HL-93 | 10.8 | 34.8 |
InQuik prefers to work with standard designs where possible to optimize the design and manufacturing processes. However, bridges do have variable site specific needs, and so we offer non-standard premium features as well. If a project requires any features or dimensions not listed below, we may be able to provide for them in the design as well.
The InQuik abutment length is determined by the width of the bridge.
The abutment height (to the deck shelf) is determined by the site conditions.
The size and type of foundation drives the pile openings in the abutment.
Standard Features | Non-Standard Features |
Abutment | Abutment |
|
|
Wing Walls | Wing Walls |
|
|
Foundations | Foundations |
|
|
Standard InQuik bridges have a flat side (no curb) or a castellated curb. Standard curb design is 6″ high, with a width of 8″.
Custom designs requiring a different curb can be accommodated if required. For multi-span bridges, the positive camber in the deck panel can result in a humped curb appearance, so we recommend installing a precast curb for multi-span bridges instead of the prefabricated InQuik curb.
Appropriate fixings and connections for barriers can also be included in the deck design, with a standard barrier design available for side and top-mounted low performance barriers.
The InQuik system is certified for low, regular, and medium performance barriers, and can accommodate a customized connection system as required.
Standard InQuik bridges include low performance Thrie-beam or regular performance TMR-style barrier.
Note: All galvanized components such as barrier posts and Thrie-beams must be stored correctly when they are received on site to prevent the formation of white rust. They need to be kept dry and clean, and positioned to allow any water which does accumulate on them to run off.
Barrier Style | Performance Rating |
Three-beam | Low performance side-mounted or top-mounted |
TMR-style steel barrier | Regular performance |
RMS-style steel barrier | Regular performance |
Concrete | Regular performance |

Download InQuik Bridges
Product Catalog
The InQuik® bridge is a modular system, where the integrated steel formwork and reinforcing components are prefabricated off-site, then completed when concrete is poured on-site to form a single homogeneous mass.
2.89 MB file size