The county selected the InQuik Bridge solution because it empowered
them with more control over decision-making and project delivery, as
well as an expedited construction process. They could leverage their
internal resources and equipment while hiring local contractors for
specialty construction services. This hybrid and collaborative delivery
approach enabled rapid construction, completing the project within
10 months of inspection which also led to cost savings compared to
common project delivery processes and timelines. The road closure
was limited to just three weeks, minimizing disruption to freight and
local traffic. The successful outcome resulted from effective
partnership between the county, state DOT, consulting engineers, local
contractors and the CMC Bridge Systems team.
CTH-N Bridge
Dimensions
40'L (37' clear-span) x 35' W
Single Span
Client
Marathon County
InQuik Products
IQ40
About
A biennial bridge inspection identified issues with a
county highway bridge, including scour and structural,
so the county had to face a load posting, or expedite the
replacement of their bridge because it’s on a critical
freight route.
Location
Marathon County
Wisconsin
United States

Request a Quote
Request a free consultation to define a solution that aligns with your project requirements and budget.

