This project demonstrates the power of InQuik technology and versatility in overcoming construction challenges, as well as collaborative efforts in the #FixingCountyBridges Initiative, with the active participation of Shoalhaven City Council and Transport for NSW.
The innovative approach involved constructing the bridge into two halves. Initially, a 16.1 x 4.8m section was opened, allowing traffic to flow seamlessly. Subsequently, a 16.1 x 2.4m addition transformed the structure into a two-lane bridge post-demolition.